127 Victoria Park Ave, Toronto: School Renovation

More photos of this address 2

Dillan PayneCC BY-SA 4.0 · Commons

Dillan PayneCC BY-SA 4.0 · Commons
School Renovation at 127 Victoria Park Ave, Toronto was permitted on April 4, 2025 with a stated construction value of under $1M. Proposal for Interior alterations of existing washrooms, change rooms and staff office on Main Floor. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 127 Victoria Park Ave, Toronto |
| Neighbourhood | Birchcliffe-Cliffside |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | April 4, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Mechanical |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for Interior alterations of existing washrooms, change rooms and staff office on Main Floor”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 28, 2019Fire and life safety: fire protection
- April 4, 2025Addition or alteration: School Renovation · under $1M (this page)
- May 2025Estimated construction start (estimate)
- November 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 1161 Kingston RdNew building · $25M to $50M · March 2026
3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2025 – Nov 2025 | Estimate |
| Construction Site Security | Apr 2025 – Jun 2025 | Window passed (est.) |
| Painting | May 2025 – Jul 2025 | Window passed (est.) |
| Electrical | Jun 2025 – Jul 2025 | Window passed (est.) |
| HVAC and Mechanical | Jun 2025 – Jul 2025 | Window passed (est.) |
| Plumbing | May 2025 – Jul 2025 | Window passed (est.) |
| Fire Protection | Jun 2025 – Jul 2025 | Window passed (est.) |
| Signage and Wayfinding | Jul 2025 – Sep 2025 | Window passed (est.) |
| Insulation | Jun 2025 – Jul 2025 | Window passed (est.) |
| Drywall | Jun 2025 – Jul 2025 | Window passed (est.) |
| Low Voltage and Data | Jun 2025 – Jul 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2025) to the estimated completion (November 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 2535 Gerrard St E: Affordable Housing Renovation
- 2328 Kingston Rd: 10-Storey Mixed-Use Building Renovation
- 2217 Kingston Rd: Office and Tenant Fit-Out
- 3650 Danforth Ave: Data Centre Renovation
- 53 Flerimac Rd: Retail Building
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 127 Victoria Park Ave?
School Renovation. Proposal for Interior alterations of existing washrooms, change rooms and staff office on Main Floor
When was the permit issued for 127 Victoria Park Ave?
April 4, 2025, by the City of Toronto.
Who is building 127 Victoria Park Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 127 Victoria Park Ave need now?
Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.