2328 Kingston Rd, Toronto: 10-Storey Mixed-Use Building Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

10-Storey Mixed-Use Building Renovation at 2328 Kingston Rd, Toronto was permitted on March 3, 2026 with a stated construction value of under $1M. Proposal to construct geothermal system to new 10-storey mixed use building. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address2328 Kingston Rd, Toronto
NeighbourhoodBirchcliffe-Cliffside
Project10-Storey Mixed-Use Building Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedMarch 3, 2026
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitLCH Developments
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal to construct geothermal system to new 10-storey mixed use building”

Where this project is

  1. July 23, 2019Plumbing · under $1M
  2. September 29, 2023Demolition
  3. January 2, 2026New building
  4. March 3, 2026Mechanical: 10-Storey Mixed-Use Building Renovation · under $1M (this page)
  5. October 16, 2026New building
  6. April 2026Estimated construction start (estimate)
  7. October 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 2217 Kingston RdAddition or alteration: interior alteration · $10M to $25M · December 2025

1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →

This project   The nearby project, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

LCH Developments has 3 other projects in Builtie

  • Toronto · Demolition · 2026
  • Toronto · Demolition · 2025
  • Toronto · Demolition · 2024

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Apr 2026 – Oct 2026Estimate
Construction Site SecurityMar 2026 – Apr 2026Window passed (est.)
PaintingApr 2026 – Jun 2026Window passed (est.)
MasonryApr 2026Window passed (est.)
WaterproofingApr 2026Window passed (est.)
RoofingApr 2026 – May 2026Window passed (est.)
Windows, Doors and GlazingApr 2026 – May 2026Window passed (est.)
ElectricalApr 2026 – Jun 2026Window passed (est.)
HVAC and MechanicalApr 2026 – Jun 2026Window passed (est.)
PlumbingApr 2026 – Jun 2026Window passed (est.)
Fire ProtectionApr 2026 – Jun 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 2328 Kingston Rd?

10-Storey Mixed-Use Building Renovation. Proposal to construct geothermal system to new 10-storey mixed use building

When was the permit issued for 2328 Kingston Rd?

March 3, 2026, by the City of Toronto.

Who is building 2328 Kingston Rd?

LCH Developments is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 2328 Kingston Rd need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.