254 Birmingham St, Toronto: Retail Building

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Retail Building at 254 Birmingham St, Toronto was permitted on September 24, 2026 with a stated construction value of under $1M. Proposed three storey semi-detached fourplex. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address254 Birmingham St, Toronto
ProjectRetail Building
Building typeResidential
WorkNew building
Permit issuedSeptember 24, 2026
Housing units4
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed three storey semi-detached fourplex”

Where this project is

  1. Since September 20263 other permits at this address
  2. September 24, 2026New construction · under $1M
  3. September 24, 2026New construction: Retail Building · under $1M (this page)
  4. September 24, 2026Demolition
  5. September 24, 2026Plumbing
  6. September 24, 2026Plumbing
  7. September 24, 2026Drains and site services
  8. October 2026Estimated construction start (estimate)
  9. April 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →

This project   The nearby project, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 6 to approach now, 1 coming up.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2026 – Apr 2027Estimate
Excavation and Site WorkOct 2026Approach now
Construction Site SecurityOct 2026 – Nov 2026Approach now
Concrete and FoundationOct 2026 – Nov 2026Approach now
Structural SteelOct 2026 – Nov 2026Approach now
ElevatorsOct 2026 – Nov 2026Approach now
FramingOct 2026 – Nov 2026Approach now
PaintingNov 2026 – Dec 2026Coming up

How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (April 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 254 Birmingham St?

Retail Building. Proposed three storey semi-detached fourplex

When was the permit issued for 254 Birmingham St?

September 24, 2026, by the City of Toronto.

Who is building 254 Birmingham St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 254 Birmingham St need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing. Coming up: painting from November 2026.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.