Apartment Building at 38 Edgecroft Rd, Toronto was permitted on August 10, 2026 with a stated construction value of under $1M. Proposal to construct a three storey mulitplex (3 units), and rear decks at the second and third floor. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 38 Edgecroft Rd, Toronto |
| Project | Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | August 10, 2026 |
| Housing units | 3 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to construct a three storey mulitplex (3 units), and rear decks at the second and third floor”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- August 10, 2026New construction: Apartment Building · under $1M (this page)
- August 10, 2026Demolition
- August 10, 2026Mechanical
- August 10, 2026Drains and site services
- August 10, 2026Plumbing
- September 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 20 Queen Elizabeth BlvdNew building · $1M to $5M · December 2025
- 721 Royal York RdDemolition · $1M to $5M · January 2026
- 1001 The QueenswayAddition or alteration: interior alteration · $1M to $5M · November 2025
- 81 Edgecroft RdNew building · $1M to $5M · January 2026
7 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 9 to approach now, 1 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2026 – Mar 2027 | Estimate |
| Construction Site Security | Aug 2026 – Oct 2026 | Approach now |
| Concrete and Foundation | Aug 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Sep 2026 – Oct 2026 | Approach now |
| Elevators | Sep 2026 – Oct 2026 | Approach now |
| Framing | Sep 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Sep 2026 – Oct 2026 | Approach now |
| Waterproofing | Sep 2026 – Oct 2026 | Approach now |
| Roofing | Sep 2026 – Nov 2026 | Approach now |
| Windows, Doors and Glazing | Sep 2026 – Oct 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 254 Birmingham St: Retail Building
- 18 Portland St: Office and Tenant Fit-Out
- 1735 Kipling Ave: Office and Tenant Fit-Out
- 3 Balford Ave: 2-Storey Retail Building
- 495 Wilson Ave: Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 38 Edgecroft Rd?
Apartment Building. Proposal to construct a three storey mulitplex (3 units), and rear decks at the second and third floor
When was the permit issued for 38 Edgecroft Rd?
August 10, 2026, by the City of Toronto.
Who is building 38 Edgecroft Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 38 Edgecroft Rd need now?
Estimated as of October 2026, the trades to approach now are site security; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing. Already passed: concrete.