1377 The Queensway, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 1377 The Queensway, Toronto was permitted on August 21, 2026 with a stated construction value of under $1M. Proposal for interior alterations, fit out for new restaurant. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1377 The Queensway, Toronto
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedAugust 21, 2026
Stated construction valueunder $1M
Estimated stageExcavation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for interior alterations, fit out for new restaurant”

Where this project is

  1. Since January 20227 other permits at this address
  2. February 16, 2022Drains and site services: roofing · under $1M
  3. June 27, 2023Mechanical
  4. November 22, 2023Addition or alteration: mechanical · under $1M
  5. November 23, 2023Mechanical
  6. October 7, 2024Plumbing
  7. August 21, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  8. September 2026Estimated construction start (estimate)
  9. March 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 1156 The QueenswayNew construction: excavation and shoring · $100M to $250M · December 2025
  • 1572 The QueenswayNew building · $10M to $25M · December 2025
  • 1053 The QueenswayNew construction: foundation · $5M to $10M · November 2025
  • 454 Evans AveAddition or alteration: interior alteration · $1M to $5M · March 2026
  • 476 Evans AveAddition or alteration: interior alteration · $1M to $5M · December 2025

9 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 to approach now, 2 passed.

TradeWhen to approach (est.)Status
Construction (est.)Sep 2026 – Mar 2027Estimate
Excavation and Site WorkAug 2026 – Sep 2026Window passed (est.)
Construction Site SecurityAug 2026 – Oct 2026Approach now
Concrete and FoundationAug 2026 – Sep 2026Window passed (est.)
Structural SteelSep 2026 – Oct 2026Approach now
ElevatorsSep 2026 – Oct 2026Approach now
FramingSep 2026 – Oct 2026Approach now
PaintingSep 2026 – Nov 2026Approach now
MasonrySep 2026 – Oct 2026Approach now
WaterproofingSep 2026 – Oct 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1377 The Queensway?

Office and Tenant Fit-Out. Proposal for interior alterations, fit out for new restaurant

When was the permit issued for 1377 The Queensway?

August 21, 2026, by the City of Toronto.

Who is building 1377 The Queensway?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1377 The Queensway need now?

Estimated as of October 2026, the trades to approach now are site security, structural steel, elevator, framing, painting, masonry and waterproofing. Already passed: excavation and site work; concrete.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.