14 Pembroke St, Toronto: School Renovation

School Renovation at 14 Pembroke St, Toronto was permitted on July 2, 2026 with a stated construction value of under $1M. Proposed removal and replacement of roofing membrane on all existing concrete roof decks (exisitng concrete roof deck to remain) on roofs r6, r7, r17 and r18. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 14 Pembroke St, Toronto |
| Neighbourhood | Moss Park |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | July 2, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed removal and replacement of roofing membrane on all existing concrete roof decks (exisitng concrete roof deck to remain) on roofs r6, r7, r17 and r18”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since October 20062 other permits at this address
- October 5, 2006Plumbing
- October 20, 2006Mechanical · $1M to $5M
- April 7, 2017Addition or alteration
- July 31, 2019Plumbing · under $1M
- May 27, 2026Addition or alteration: interior alteration · under $1M
- July 2, 2026Addition or alteration: School Renovation · under $1M (this page)
- July 2026Estimated construction start (estimate)
- February 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 8 Elm StNew building · over $250M · March 2026
- 285 Queen St EConditional Permit · $100M to $250M · May 2026
- 325 Gerrard St EAddition or alteration: excavation and shoring · $100M to $250M · November 2025
- 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
- 227 Gerrard St ENew building · $25M to $50M · October 2025
40 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Feb 2027 | Estimate |
| Construction Site Security | Jun 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Painting | Jul 2026 – Sep 2026 | Window passed (est.) |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jul 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 163 Queen St E: Office and Tenant Fit-Out
- 311 Sherbourne St: Hotel Renovation
- 57 Ontario St: Office and Tenant Fit-Out
- 80 Sackville St: School Renovation
- 197 King St E: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 14 Pembroke St?
School Renovation. Proposed removal and replacement of roofing membrane on all existing concrete roof decks (exisitng concrete roof deck to remain) on roofs r6, r7, r17 and r18
When was the permit issued for 14 Pembroke St?
July 2, 2026, by the City of Toronto.
Who is building 14 Pembroke St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 14 Pembroke St need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.