14 St Clements Ave, Toronto: Utility Facility Renovation

Utility Facility Renovation at 14 St Clements Ave, Toronto was permitted on February 6, 2025 with a stated construction value of $5M to $10M. Proposal for interior and exterior alteration (demolition, new lift device, stair location, structural upgrades, waterproofing, HVAC, electrical, plumbing, etc.). Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 14 St Clements Ave, Toronto |
| Neighbourhood | Yonge-Eglinton |
| Project | Utility Facility Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | February 6, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for interior and exterior alteration (demolition, new lift device, stair location, structural upgrades, waterproofing, HVAC, electrical, plumbing, etc.)”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 2300 Yonge St: Office and Tenant Fit-Out
- 2190 Yonge St: Office and Tenant Fit-Out
- 2180 Yonge St: Office and Tenant Fit-Out
- 86 Gerrard St E: Apartment Building Renovation
- 1411 Queen St E: Transit Facility Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 14 St Clements Ave?
Utility Facility Renovation. Proposal for interior and exterior alteration (demolition, new lift device, stair location, structural upgrades, waterproofing, HVAC, electrical, plumbing, etc.)
When was the permit issued for 14 St Clements Ave?
February 6, 2025, by the City of Toronto.
Who is building 14 St Clements Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 14 St Clements Ave need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
