86 Gerrard St E, Toronto: Apartment Building Renovation

Apartment Building Renovation at 86 Gerrard St E, Toronto was permitted on March 5, 2025 with a stated construction value of $5M to $10M. Balcony solarium demolition approx 75 sq m (floor area) and installation of balcony waterproofing, localized concrete curb/slab edge repairs approx 5 sq m (vertical surface) and localized concrete coating installation approx 5 sq m (vertical surface).… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 86 Gerrard St E, Toronto |
| Neighbourhood | Downtown Yonge East |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | March 5, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Framing |
| Company named on the permit | BDA Restoration Contractors |
| Decision makers and contacts | In Builtie |
From the permit: “Balcony solarium demolition approx 75 sq m (floor area) and installation of balcony waterproofing, localized concrete curb/slab edge repairs approx 5 sq m (vertical surface) and localized concrete coating installation approx 5 sq m (vertical surface).…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 36 Toronto St: Office and Tenant Fit-Out
- 222 Jarvis St: Office and Tenant Fit-Out
- 2 Queen St E: Transit Facility
- 88 Queen St E: Hotel Renovation
- 30 Adelaide St E: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 86 Gerrard St E?
Apartment Building Renovation. Balcony solarium demolition approx 75 sq m (floor area) and installation of balcony waterproofing, localized concrete curb/slab edge repairs approx 5 sq m (vertical surface) and localized concrete coating installation approx 5 sq m (vertical surface).…
When was the permit issued for 86 Gerrard St E?
March 5, 2025, by the City of Toronto.
Who is building 86 Gerrard St E?
BDA Restoration Contractors is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 86 Gerrard St E need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
