222 Jarvis St, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 222 Jarvis St, Toronto was permitted on October 20, 2025 with a stated construction value of $5M to $10M. Proposal to repair soffits, curtain walls, ledge beams and replacement of the existing monorail system. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 222 Jarvis St, Toronto |
| Neighbourhood | Downtown Yonge East |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | October 20, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal to repair soffits, curtain walls, ledge beams and replacement of the existing monorail system”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 50 Richmond St E: Office and Tenant Fit-Out
- 36 Toronto St: Office and Tenant Fit-Out
- 65 King St E: Office and Tenant Fit-Out
- 86 Gerrard St E: Apartment Building Renovation
- 2 Queen St E: Transit Facility
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 222 Jarvis St?
Office and Tenant Fit-Out. Proposal to repair soffits, curtain walls, ledge beams and replacement of the existing monorail system
When was the permit issued for 222 Jarvis St?
October 20, 2025, by the City of Toronto.
Who is building 222 Jarvis St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 222 Jarvis St need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
