1441 29 St NW, Calgary: Healthcare Building Renovation

Commercial building under construction with a tower crane
Figures read October 20, 2026 from Builtie's permit data.

Healthcare Building Renovation at 1441 29 St NW, Calgary was permitted on September 4, 2026 with a stated construction value of $10M to $25M. Group B2 Hospital 3.2.2.38. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1441 29 St NW, Calgary
ProjectHealthcare Building Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedSeptember 4, 2026
Stated construction value$10M to $25M
Estimated stagePermit
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Group B2 Hospital 3.2.2.38”

Which trades are being bought now

The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Excavation and Site WorkBefore construction starts
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Calgary

All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1441 29 St NW?

Healthcare Building Renovation. Group B2 Hospital 3.2.2.38

When was the permit issued for 1441 29 St NW?

September 4, 2026, by the City of Calgary.

Who is building 1441 29 St NW?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1441 29 St NW need now?

At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.