14446 Old Hickory Blvd, Nashville: Institutional Project

Institutional Project at 14446 Old Hickory Blvd, Nashville was permitted on March 5, 2025 with a stated construction value of $1M to $5M. To construct football stadium seating w/press box, baseball bleacher seating, outdoor amphitheater seating area, accessory site lighting. Master Use Permit #2022029708 POC: Scott Schwenk 803.404.7401. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 14446 Old Hickory Blvd, Nashville |
| Project | Institutional Project |
| Building type | Institutional |
| Work | New building |
| Permit issued | March 5, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Mechanical |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To construct football stadium seating w/press box, baseball bleacher seating, outdoor amphitheater seating area, accessory site lighting. Master Use Permit #2022029708 POC: Scott Schwenk 803.404.7401”
Which trades are being bought now
The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1734 Gallatin Pike N: Restaurant
- 1431 Vultee Blvd: Warehouse Renovation
- 6030 Dana Way: Warehouse Renovation
- 2920 Hamilton Church Rd: Place of Worship
- 950 Signal Xing: Office and Tenant Fit-Out
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 14446 Old Hickory Blvd?
Institutional Project. To construct football stadium seating w/press box, baseball bleacher seating, outdoor amphitheater seating area, accessory site lighting. Master Use Permit #2022029708 POC: Scott Schwenk 803.404.7401
When was the permit issued for 14446 Old Hickory Blvd?
March 5, 2025, by Metro Nashville and Davidson County.
Who is building 14446 Old Hickory Blvd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 14446 Old Hickory Blvd need now?
At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
