1734 Gallatin Pike N, Nashville: Restaurant

Restaurant at 1734 Gallatin Pike N, Nashville was permitted on August 4, 2026 with a stated construction value of $1M to $5M. To construct a new 2,821 SF Raising Canes with dual drive-thru and small outdoor patio space. Prior structure demolished under permit #T2026009657. Commercial Planned Unit development Ord #O96-555. POC: David Abbey 615.227.5863. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1734 Gallatin Pike N, Nashville |
| Project | Restaurant |
| Building type | Commercial |
| Work | New building |
| Permit issued | August 4, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Embree Construction Group Inc. |
| Decision makers and contacts | In Builtie |
From the permit: “To construct a new 2,821 SF Raising Canes with dual drive-thru and small outdoor patio space. Prior structure demolished under permit #T2026009657. Commercial Planned Unit development Ord #O96-555. POC: David Abbey 615.227.5863”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 14446 Old Hickory Blvd: Institutional Project
- 1431 Vultee Blvd: Warehouse Renovation
- 6030 Dana Way: Warehouse Renovation
- 950 Signal Xing: Office and Tenant Fit-Out
- 2920 Hamilton Church Rd: Place of Worship
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1734 Gallatin Pike N?
Restaurant. To construct a new 2,821 SF Raising Canes with dual drive-thru and small outdoor patio space. Prior structure demolished under permit #T2026009657. Commercial Planned Unit development Ord #O96-555. POC: David Abbey 615.227.5863
When was the permit issued for 1734 Gallatin Pike N?
August 4, 2026, by Metro Nashville and Davidson County.
Who is building 1734 Gallatin Pike N?
Embree Construction Group Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1734 Gallatin Pike N need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.