15 Jane St, Toronto: Transit Facility Renovation

Transit Facility Renovation at 15 Jane St, Toronto was permitted on July 21, 2025 with a stated construction value of under $1M. Two (2) addition stairs to accommodate access from concourse level to platform. Existing two (2) stairs modified to enhance the fareline capacity. Provide six (6) additional Presto card fare gates-(four (4) standard and two (2) accessible fare gates) from… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 15 Jane St, Toronto |
| Neighbourhood | Runnymede-Bloor West Village |
| Project | Transit Facility Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | July 21, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Likely complete |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Two (2) addition stairs to accommodate access from concourse level to platform. Existing two (2) stairs modified to enhance the fareline capacity. Provide six (6) additional Presto card fare gates-(four (4) standard and two (2) accessible fare gates) from…”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since June 20031 other permit at this address
- June 25, 2003Addition or alteration: elevator · $1M to $5M
- August 31, 2011Addition or alteration: interior alteration · under $1M
- September 28, 2011Mechanical
- September 28, 2011Plumbing
- September 20, 2016Addition or alteration: structural work · under $1M
- July 21, 2025Addition or alteration: Transit Facility Renovation · under $1M (this page)
- August 2025Estimated construction start (estimate)
- February 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 71 Jane StAddition or alteration · $1M to $5M · May 2026
5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
Builtie stages each project as it moves; the trades open on it change week to week.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 321 Jane St: Mixed-Use Building Renovation
- 2374 Bloor St W: 2-Storey Mixed-Use Building Renovation
- 9 Hanley St: Retail Building
- 119 Brookside Ave: 3-Storey Retail Building Renovation
- 52 Nairn Ave: Retail Building
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 15 Jane St?
Transit Facility Renovation. Two (2) addition stairs to accommodate access from concourse level to platform. Existing two (2) stairs modified to enhance the fareline capacity. Provide six (6) additional Presto card fare gates-(four (4) standard and two (2) accessible fare gates) from…
When was the permit issued for 15 Jane St?
July 21, 2025, by the City of Toronto.
Who is building 15 Jane St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 15 Jane St need now?
It depends on the stage; Builtie tracks it.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
