321 Jane St, Toronto: Mixed-Use Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Mixed-Use Building Renovation at 321 Jane St, Toronto was permitted on February 11, 2025 with a stated construction value of under $1M. Proposed alterations to an existing two storey mixed use building to construct a three storeysingle family dwelling, with a fourth storey mechanical penthouse. Ground floorcommercial space to be retained. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address321 Jane St, Toronto
NeighbourhoodRunnymede-Bloor West Village
ProjectMixed-Use Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedFebruary 11, 2025
Stated construction valueunder $1M
Estimated stageMechanical
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed alterations to an existing two storey mixed use building to construct a three storeysingle family dwelling, with a fourth storey mechanical penthouse. Ground floorcommercial space to be retained”

Where this project is

  1. February 11, 2025Mechanical
  2. February 11, 2025Plumbing
  3. February 11, 2025Addition or alteration: Mixed-Use Building Renovation · under $1M (this page)
  4. March 13, 2025Drains and site services
  5. March 2025Estimated construction start (estimate)
  6. September 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 71 Jane StAddition or alteration · $1M to $5M · May 2026

5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   The nearby project, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Mar 2025 – Sep 2025Estimate
Construction Site SecurityFeb 2025 – Apr 2025Window passed (est.)
PaintingMar 2025 – May 2025Window passed (est.)
ElectricalApr 2025 – May 2025Window passed (est.)
HVAC and MechanicalApr 2025 – May 2025Window passed (est.)
PlumbingMar 2025 – May 2025Window passed (est.)
Fire ProtectionApr 2025 – May 2025Window passed (est.)
Signage and WayfindingMay 2025 – Jul 2025Window passed (est.)
InsulationApr 2025 – May 2025Window passed (est.)
DrywallApr 2025 – Jun 2025Window passed (est.)
Low Voltage and DataApr 2025 – Jun 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (March 2025) to the estimated completion (September 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 321 Jane St?

Mixed-Use Building Renovation. Proposed alterations to an existing two storey mixed use building to construct a three storeysingle family dwelling, with a fourth storey mechanical penthouse. Ground floorcommercial space to be retained

When was the permit issued for 321 Jane St?

February 11, 2025, by the City of Toronto.

Who is building 321 Jane St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 321 Jane St need now?

Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.