15205 Via de las Olas, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 15205 Via de las Olas, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on December 11, 2025 with a stated construction value of $500K to $1M, and the rebuild is with the structure going up (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 15205 Via de las Olas, Pacific Palisades, Los Angeles, CA |
| City permit address | 15205 W Via De Las Olas |
| Rebuild | New single-family home |
| What the plans show | 2 storeys, detached garage, accessory dwelling unit, fire sprinklers throughout |
| Rebuild track | Like-for-like rebuild (the City's expedited track under Emergency Executive Order 1) |
| Building permit issued | December 11, 2025 |
| Status | With the structure going up (Builtie's estimate) |
| Stated construction value | $500K to $1M |
| Builder named on the permits | T Apple General Contracting Incorporated |
| Permits at this address since the fire | 3 |
The facts above are read from the City of Los Angeles building permits filed for 15205 Via de las Olas since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| December 11, 2025 | Grading | Issued |
| December 11, 2025 | New single-family home | Issued |
| December 11, 2025 | New accessory dwelling unit (ADU) | Issued |
3 permits since December 11, 2025. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
15205 Via de las Olas is with the structure going up (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
Other rebuilds on Via de las Olas
- 15231 Via de las Olas: New single-family home, finaled
- 15247 Via de las Olas: Home repair or alteration, complete
- 15265 Via de las Olas: New accessory dwelling unit (ADU), complete
- 15351 Via de las Olas: New single-family home, foundation
- 15351-15353 Via de las Olas: Home addition, foundation
- 15413 Via de las Olas: New single-family home, framing
- 15425 Via de las Olas: New single-family home, interior trades
- 15507 Via de las Olas: New accessory dwelling unit (ADU), interior trades
All of them: fire rebuilds on Via de las Olas. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 15205 Via de las Olas, Pacific Palisades?
New single-family home (2 storeys, detached garage, accessory dwelling unit, fire sprinklers throughout), permitted December 11, 2025 after the January 2025 Palisades Fire.
What is the status of the rebuild at 15205 Via de las Olas?
It is with the structure going up (Builtie's estimate), read October 20, 2026.
Is 15205 Via de las Olas a like-for-like rebuild?
Yes. The City marked its permit eligible for the expedited like-for-like track.
Who is building 15205 Via de las Olas?
T Apple General Contracting Incorporated is named on the permits. The decision makers and contacts are in Builtie.