15301 Bestor Blvd, Pacific Palisades: New single-family home After the 2025 Fire

Newly built homes under construction on a residential street
Figures read October 20, 2026 from City of Los Angeles building permits.

New single-family home at 15301 Bestor Blvd, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on December 11, 2025 with a stated construction value of $1M to $5M, and the rebuild is with the structure going up (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The rebuild

Address15301 Bestor Blvd, Pacific Palisades, Los Angeles, CA
City permit address15301 W Bestor Blvd
RebuildNew single-family home
What the plans show2 storeys, basement, attached garage, pool or spa, fire sprinklers throughout
Rebuild trackLike-for-like rebuild (the City's expedited track under Emergency Executive Order 1)
Building permit issuedDecember 11, 2025
StatusWith the structure going up (Builtie's estimate)
Stated construction value$1M to $5M
Builder named on the permitsA M G Capital
Permits at this address since the fire5

The facts above are read from the City of Los Angeles building permits filed for 15301 Bestor Blvd since the January 2025 Palisades Fire. Owners and permit numbers are left out.

Permit timeline

IssuedPermitStatus
December 11, 2025New single-family homeIssued
December 11, 2025Retaining wallIssued
December 11, 2025GradingIssued
February 10, 2026Pool and spaIssued
April 24, 2026Temporary shoringIssued

5 permits since December 11, 2025. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.

Where it stands

15301 Bestor Blvd is with the structure going up (Builtie's estimate).

At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%
Electrical20% to 45%
HVAC and Mechanical20% to 45%
Plumbing20% to 45%
Fire Protection25% to 50%

Other rebuilds on Bestor Blvd

All of them: fire rebuilds on Bestor Blvd. Every street: the Pacific Palisades fire rebuild tracker.

For contractors

Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 15301 Bestor Blvd, Pacific Palisades?

New single-family home (2 storeys, basement, attached garage, pool or spa, fire sprinklers throughout), permitted December 11, 2025 after the January 2025 Palisades Fire.

What is the status of the rebuild at 15301 Bestor Blvd?

It is with the structure going up (Builtie's estimate), read October 20, 2026.

Is 15301 Bestor Blvd a like-for-like rebuild?

Yes. The City marked its permit eligible for the expedited like-for-like track.

Who is building 15301 Bestor Blvd?

A M G Capital is named on the permits. The decision makers and contacts are in Builtie.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.