155 College St, Toronto: Campus Building Renovation

Campus Building Renovation at 155 College St, Toronto was permitted on April 7, 2026 with a stated construction value of under $1M. Proposed interior alterations at 5th floor rooms 548, 550, 551, 552, 565 & 567. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 155 College St, Toronto |
| Project | Campus Building Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | April 7, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed interior alterations at 5th floor rooms 548, 550, 551, 552, 565 & 567”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since April 200511 other permits at this address
- June 9, 2005Fire and life safety: fire protection · under $1M
- July 21, 2022Addition or alteration: interior alteration · under $1M
- April 2, 2024Addition or alteration: interior alteration · under $1M
- April 7, 2026Addition or alteration: Campus Building Renovation · under $1M (this page)
- May 13, 2026Addition or alteration: mechanical · under $1M
- June 16, 2026Mechanical · under $1M
- April 2026Estimated construction start (estimate)
- November 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 8 Elm StNew building · over $250M · March 2026
- 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
- 900 Bay StAddition or alteration: interior alteration · $25M to $50M · April 2026
- 150 College StAddition or alteration: demolition · $25M to $50M · May 2026
- 555 University AveAddition or alteration: demolition · $25M to $50M · February 2026
34 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Apr 2026 – Nov 2026 | Estimate |
| Fire Protection | May 2026 – Jun 2026 | Window passed (est.) |
| Signage and Wayfinding | Jul 2026 – Aug 2026 | Window passed (est.) |
| Insulation | May 2026 – Jul 2026 | Window passed (est.) |
| Drywall | Jun 2026 – Jul 2026 | Window passed (est.) |
| Low Voltage and Data | Jun 2026 – Jul 2026 | Window passed (est.) |
| Tile | Jun 2026 – Jul 2026 | Window passed (est.) |
| Cabinetry and Millwork | Jun 2026 – Jul 2026 | Window passed (est.) |
| Flooring | Jun 2026 – Jul 2026 | Window passed (est.) |
| Countertops | Jun 2026 – Jul 2026 | Window passed (est.) |
| Finish Carpentry | Jun 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1876 A Keele St: Residential Project
- 1876 B Keele St: Residential Project
- 120 Town Haven Pl: Apartment Building Renovation
- 277 Victoria St: Residential Project Renovation
- 2902 Dundas St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 155 College St?
Campus Building Renovation. Proposed interior alterations at 5th floor rooms 548, 550, 551, 552, 565 & 567
When was the permit issued for 155 College St?
April 7, 2026, by the City of Toronto.
Who is building 155 College St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 155 College St need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
