1583 Calle Patricia, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 1583 Calle Patricia, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on February 11, 2026 with a stated construction value of $1M to $5M, and the rebuild is with the structure going up (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 1583 Calle Patricia, Pacific Palisades, Los Angeles, CA |
| City permit address | 1583 N Calle Patricia |
| Rebuild | New single-family home |
| What the plans show | 2 storeys, attached garage, pool or spa |
| Building permit issued | February 11, 2026 |
| Status | With the structure going up (Builtie's estimate) |
| Stated construction value | $1M to $5M |
| Builder named on the permits | Mackey Construction |
| Permits at this address since the fire | 4 |
The facts above are read from the City of Los Angeles building permits filed for 1583 Calle Patricia since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| February 11, 2026 | New single-family home | Issued |
| April 10, 2026 | Repair or alteration: revision to an earlier permit | Issued |
| September 10, 2026 | Grading | Issued |
| September 10, 2026 | Pool and spa | Issued |
4 permits since February 11, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
1583 Calle Patricia is with the structure going up (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
Other rebuilds on Calle Patricia
- 1579 Calle Patricia: New single-family home, framing
All of them: Calle Patricia. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1583 Calle Patricia, Pacific Palisades?
New single-family home (2 storeys, attached garage, pool or spa), permitted February 11, 2026 after the January 2025 Palisades Fire.
What is the status of the rebuild at 1583 Calle Patricia?
It is with the structure going up (Builtie's estimate), read October 20, 2026.
Who is building 1583 Calle Patricia?
Mackey Construction is named on the permits. The decision makers and contacts are in Builtie.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
