16 Ripon Rd, Toronto: Retail Building

Retail Building at 16 Ripon Rd, Toronto was permitted on December 10, 2025 with a stated construction value of under $1M. Proposal to new construction of two storey, four - unit dwelling with a rear basement walkout and rear deck, rear balcony, front balcony, front porch [ZAP Certifcate as reference only]. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 16 Ripon Rd, Toronto |
| Neighbourhood | O'Connor-Parkview |
| Project | Retail Building |
| Building type | Residential |
| Work | New building |
| Permit issued | December 10, 2025 |
| Housing units | 4 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to new construction of two storey, four - unit dwelling with a rear basement walkout and rear deck, rear balcony, front balcony, front porch [ZAP Certifcate as reference only]”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- July 22, 2025Drains and site services
- July 22, 2025Plumbing
- July 22, 2025Mechanical
- December 10, 2025New construction: Retail Building · under $1M (this page)
- December 10, 2025Demolition
- January 2026Estimated construction start (estimate)
- July 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 30 Teesdale PlAddition or alteration: structural work · $5M to $10M · August 2026
- 313 Pharmacy AveAddition or alteration · $1M to $5M · June 2026
- 4 Massey SqDesignated Structures · $1M to $5M · April 2026
4 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jan 2026 – Jul 2026 | Estimate |
| Construction Site Security | Dec 2025 – Feb 2026 | Window passed (est.) |
| Painting | Jan 2026 – Mar 2026 | Window passed (est.) |
| Masonry | Jan 2026 – Feb 2026 | Window passed (est.) |
| Waterproofing | Jan 2026 – Feb 2026 | Window passed (est.) |
| Roofing | Jan 2026 – Mar 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jan 2026 – Feb 2026 | Window passed (est.) |
| Electrical | Feb 2026 – Mar 2026 | Window passed (est.) |
| HVAC and Mechanical | Feb 2026 – Mar 2026 | Window passed (est.) |
| Plumbing | Jan 2026 – Mar 2026 | Window passed (est.) |
| Fire Protection | Feb 2026 – Mar 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (January 2026) to the estimated completion (July 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1400 O'connor Dr: Office and Tenant Fit-Out
- 32 Cranfield Rd: Self-Storage Building Renovation
- 2775 St Clair Ave E: Mixed-Use Building Renovation
- 184 College St: Campus Building Renovation
- 777 R Bay St: Parking Structure Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 16 Ripon Rd?
Retail Building. Proposal to new construction of two storey, four - unit dwelling with a rear basement walkout and rear deck, rear balcony, front balcony, front porch [ZAP Certifcate as reference only]
When was the permit issued for 16 Ripon Rd?
December 10, 2025, by the City of Toronto.
Who is building 16 Ripon Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 16 Ripon Rd need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
