16762 Via la Costa, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 16762 Via la Costa, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on November 4, 2025 with a stated construction value of $1M to $5M, and the rebuild is with the structure going up (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 16762 Via la Costa, Pacific Palisades, Los Angeles, CA |
| City permit address | 16762 W Via La Costa |
| Rebuild | New single-family home |
| What the plans show | 2 storeys, basement, attached garage, pool or spa, fire sprinklers throughout |
| Rebuild track | Like-for-like rebuild (the City's expedited track under Emergency Executive Order 1) |
| Building permit issued | November 4, 2025 |
| Status | With the structure going up (Builtie's estimate) |
| Stated construction value | $1M to $5M |
| Builder named on the permits | Gibson Gordon S Inc |
| Permits at this address since the fire | 5 |
The facts above are read from the City of Los Angeles building permits filed for 16762 Via la Costa since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| November 4, 2025 | New single-family home | Issued |
| November 4, 2025 | Grading | Issued |
| January 6, 2026 | Repair or alteration: revision to an earlier permit | Issued |
| February 5, 2026 | Pool and spa | Issued |
| March 10, 2026 | Grading: revision to an earlier permit | Issued |
5 permits since November 4, 2025. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
16762 Via la Costa is with the structure going up (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
Other rebuilds on Via la Costa
- 16722 Via la Costa: New single-family home, framing
- 16754 Via la Costa: New single-family home, framing
All of them: fire rebuilds on Via la Costa. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 16762 Via la Costa, Pacific Palisades?
New single-family home (2 storeys, basement, attached garage, pool or spa, fire sprinklers throughout), permitted November 4, 2025 after the January 2025 Palisades Fire.
What is the status of the rebuild at 16762 Via la Costa?
It is with the structure going up (Builtie's estimate), read October 20, 2026.
Is 16762 Via la Costa a like-for-like rebuild?
Yes. The City marked its permit eligible for the expedited like-for-like track.
Who is building 16762 Via la Costa?
Gibson Gordon S Inc is named on the permits. The decision makers and contacts are in Builtie.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.