170 The West Mall, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 170 The West Mall, Toronto was permitted on June 3, 2026 with a stated construction value of under $1M. Proposal for interior alterations to renovate existing office at mezzanine. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 170 The West Mall, Toronto |
| Project | Office and Tenant Fit-Out |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | June 3, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | R.K. Porter General Contracting Inc. |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for interior alterations to renovate existing office at mezzanine”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since September 199817 other permits at this address
- October 11, 2011Addition or alteration · $5M to $10M
- December 6, 2012Fire and life safety · under $1M
- March 1, 2019Fire and life safety · $1M to $5M
- October 12, 2022Addition or alteration: demolition
- April 27, 2026Addition or alteration: demolition · under $1M
- June 3, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- June 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby: 5 more renovations within 1 km
- 185 The West MallAddition or alteration: interior alteration · $1M to $5M · February 2026
- 250 The East MallAddition or alteration: interior alteration · $1M to $5M · June 2026
- 1855 Dundas St EInterior alteration · $1M to $5M · April 2026
- 1970 Dundas St EInterior alteration · $1M to $5M · April 2026
- 195 The West MallAddition or alteration: fire protection · $1M to $5M · November 2025
5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
R.K. Porter General Contracting Inc. has 2 other projects in Builtie
- Toronto · Fire and life safety: fire protection · under $1M · 2024
- Toronto · Addition or alteration: demolition · under $1M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Jan 2027 | Estimate |
| Construction Site Security | May 2026 – Jul 2026 | Window passed (est.) |
| Painting | Jun 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Roofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jun 2026 – Aug 2026 | Window passed (est.) |
| Electrical | Jul 2026 – Aug 2026 | Window passed (est.) |
| HVAC and Mechanical | Jul 2026 – Aug 2026 | Window passed (est.) |
| Plumbing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Fire Protection | Jul 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1876 A Keele St: Residential Project
- 1876 B Keele St: Residential Project
- 120 Town Haven Pl: Apartment Building Renovation
- 277 Victoria St: Residential Project Renovation
- 2902 Dundas St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 170 The West Mall?
Office and Tenant Fit-Out. Proposal for interior alterations to renovate existing office at mezzanine
When was the permit issued for 170 The West Mall?
June 3, 2026, by the City of Toronto.
Who is building 170 The West Mall?
R.K. Porter General Contracting Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 170 The West Mall need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.