1701 W 3rd Avenue, Vancouver: Transit Facility Renovation

Transit Facility Renovation at 1701 W 3rd Avenue, Vancouver was permitted on August 13, 2026 with a stated construction value of $1M to $5M. High Density Housing / Commercial - Addition / Alteration - Interior and exterior alterations and change of use from Retail to Retail Vehicle Dealer (Group E) for this existing commercial building on this site. Scope of work includes removal of the existing… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1701 W 3rd Avenue, Vancouver |
| Project | Transit Facility Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | August 13, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Tri-stad Construction Inc. |
| Decision makers and contacts | In Builtie |
From the permit: “High Density Housing / Commercial - Addition / Alteration - Interior and exterior alterations and change of use from Retail to Retail Vehicle Dealer (Group E) for this existing commercial building on this site. Scope of work includes removal of the existing…”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 1428 W 6th Avenue: Apartment Building Renovation
- 3192 W 18th Avenue: School
- 351 Abbott Street: School Renovation
- 5311 Cypress Street: Apartment Building
- 5750 Cambie Street: Office and Tenant Fit-Out
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1701 W 3rd Avenue?
Transit Facility Renovation. High Density Housing / Commercial - Addition / Alteration - Interior and exterior alterations and change of use from Retail to Retail Vehicle Dealer (Group E) for this existing commercial building on this site. Scope of work includes removal of the existing…
When was the permit issued for 1701 W 3rd Avenue?
August 13, 2026, by the City of Vancouver.
Who is building 1701 W 3rd Avenue?
Tri-stad Construction Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1701 W 3rd Avenue need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
