18425 Wakecrest Drive, Malibu: Single-family home rebuild After the Palisades Fire

Single-family home rebuild at 18425 Wakecrest Drive, Malibu, after the January 2025 Palisades Fire, permitted February 11, 2026. The plans show 3,601 sq ft, attached garage. It is under construction. Builtie follows every fire rebuild in Los Angeles, address by address.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 18425 Wakecrest Drive, Malibu, CA |
| Fire | Palisades Fire, January 2025 |
| Permits from | unincorporated Los Angeles County (Malibu mailing address) |
| Rebuild | Single-family home rebuild |
| What the plans show | 3,601 sq ft, attached garage |
| Like-for-like | Yes, a like-for-like rebuild |
| Where it stands | Rebuild in construction |
| Application filed | June 10, 2025 |
| Building permit issued | February 11, 2026 |
| Last inspection | October 6, 2026 |
| Stated construction value | $1M to $5M |
Read from the Los Angeles County's fire recovery records for 18425 Wakecrest Drive. Owners, applicants and case numbers are left out.
Rebuild progress
| County rebuild progress | |
|---|---|
| ✓ | Rebuild application received |
| ✓ | Zoning review cleared |
| ✓ | Full building plans received |
| ✓ | Building plans approved |
| ✓ | Building permit issued |
| ✓ | Rebuild in construction (now) |
| Construction completed |
The County tracks every fire rebuild through these seven steps. 18425 Wakecrest Drive is at step 6: rebuild in construction.
Trades being bought now
At this point in a rebuild these trades are inside their award window:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
Other rebuilds on Wakecrest Drive
- 18357 Wakecrest Drive: Fire rebuild, plans in review
- 18402 Wakecrest Drive: Single-family home rebuild, permit issued
- 18403 Wakecrest Drive: Single-family home rebuild, under construction
- 18414 Wakecrest Drive: Single-family home rebuild, plans in review
- 18420 Wakecrest Drive: Fire rebuild, plans in review
- 18426 Wakecrest Drive: Single-family home rebuild, under construction
- 18432 Wakecrest Drive: Single-family home rebuild, under construction
- 18447 Wakecrest Drive: Single-family home rebuild, under construction
All of them: fire rebuilds on Wakecrest Drive, Malibu. The whole area: the Malibu and Topanga Palisades Fire rebuild tracker.
For contractors
Builtie follows the fire rebuilds across Los Angeles, from Pacific Palisades to Altadena, and shows a trade which rebuilds are at the point where its work is bought. Where a permit names the builder, Builtie attaches the decision makers and their verified contacts.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being rebuilt at 18425 Wakecrest Drive, Malibu?
Single-family home rebuild (3,601 sq ft, attached garage), after the Palisades Fire of January 2025.
What is the status of the rebuild at 18425 Wakecrest Drive?
Rebuild in construction, read October 20, 2026.
Is 18425 Wakecrest Drive a like-for-like rebuild?
Yes, it is filed as like-for-like.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.