1901 C Lebanon Pike, Nashville: Commercial Project

Commercial Project at 1901 C Lebanon Pike, Nashville was permitted on January 28, 2025 with a stated construction value of $1M to $5M. To construct additional parking area (169 spaces) to expand existing used truck sales display area (established under permit #200403809) and to construct accessory lighting. POC: David Abbey 615.227.5863. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1901 C Lebanon Pike, Nashville |
| Project | Commercial Project |
| Building type | Commercial |
| Work | New building |
| Permit issued | January 28, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Mechanical |
| Company named on the permit | Frierson, T W Contractor Inc. |
| Decision makers and contacts | In Builtie |
From the permit: “To construct additional parking area (169 spaces) to expand existing used truck sales display area (established under permit #200403809) and to construct accessory lighting. POC: David Abbey 615.227.5863”
Which trades are being bought now
The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1000 Broadway 101: Office and Tenant Fit-Out
- 235 White Bridge Pike: Place of Worship Renovation
- 2400 Clifton Ave: Office and Tenant Fit-Out
- 2401 Music Valley Dr: Hotel Renovation
- 2813 Brick Church Pike: School Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1901 C Lebanon Pike?
Commercial Project. To construct additional parking area (169 spaces) to expand existing used truck sales display area (established under permit #200403809) and to construct accessory lighting. POC: David Abbey 615.227.5863
When was the permit issued for 1901 C Lebanon Pike?
January 28, 2025, by Metro Nashville and Davidson County.
Who is building 1901 C Lebanon Pike?
Frierson, T W Contractor Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1901 C Lebanon Pike need now?
At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
