235 White Bridge Pike, Nashville: Place of Worship Renovation

Place of Worship Renovation at 235 White Bridge Pike, Nashville was permitted on August 14, 2025 with a stated construction value of $1M to $5M. To construct addition and conduct renovations for existing tenant; WEST END COMMUNITY CHURCH. Addition of canopy and finish renovation to existing church . No change in use. Poc: Jonathan Dooley 615-333-9369. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 235 White Bridge Pike, Nashville |
| Project | Place of Worship Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | August 14, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Solomon Builders Inc. |
| Decision makers and contacts | In Builtie |
From the permit: “To construct addition and conduct renovations for existing tenant; WEST END COMMUNITY CHURCH. Addition of canopy and finish renovation to existing church . No change in use. Poc: Jonathan Dooley 615-333-9369”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1000 Broadway 101: Office and Tenant Fit-Out
- 1901 C Lebanon Pike: Commercial Project
- 2400 Clifton Ave: Office and Tenant Fit-Out
- 2401 Music Valley Dr: Hotel Renovation
- 2813 Brick Church Pike: School Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 235 White Bridge Pike?
Place of Worship Renovation. To construct addition and conduct renovations for existing tenant; WEST END COMMUNITY CHURCH. Addition of canopy and finish renovation to existing church . No change in use. Poc: Jonathan Dooley 615-333-9369
When was the permit issued for 235 White Bridge Pike?
August 14, 2025, by Metro Nashville and Davidson County.
Who is building 235 White Bridge Pike?
Solomon Builders Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 235 White Bridge Pike need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
