1919 Carrington Bv NW, Calgary: Townhomes

Townhomes at 1919 Carrington Bv NW, Calgary was permitted on August 29, 2025 with a stated construction value of $1M to $5M. 6-Unit Rowhouse - Carrington Blk 23. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1919 Carrington Bv NW, Calgary |
| Project | Townhomes |
| Building type | Residential |
| Work | New building |
| Permit issued | August 29, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Mattamy (northpoint) |
| Decision makers and contacts | In Builtie |
From the permit: “6-Unit Rowhouse - Carrington Blk 23”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 299 Yorkville Av SW: 2-Storey Townhomes
- 4023r Centre B St NW: School
- 3915 Centre A St NE: School
- 14 Arbour Lake Co NW: Townhomes
- 34 Arbour Lake Co NW: Townhomes
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1919 Carrington Bv NW?
Townhomes. 6-Unit Rowhouse - Carrington Blk 23
When was the permit issued for 1919 Carrington Bv NW?
August 29, 2025, by the City of Calgary.
Who is building 1919 Carrington Bv NW?
Mattamy (northpoint) is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1919 Carrington Bv NW need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
