195 Nairn Ave, Toronto: 3-Storey House

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

3-Storey House at 195 Nairn Ave, Toronto was permitted on May 28, 2026 with a stated construction value of under $1M. New house, 3 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address195 Nairn Ave, Toronto
Project3-Storey House
Building typeResidential
WorkNew building
Storeys3
Permit issuedMay 28, 2026
Housing units2
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitThomac Holdings Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. June 17, 2025Small Residential Projects: addition · under $1M
  2. May 28, 2026New construction: 3-Storey House · under $1M (this page)
  3. May 28, 2026Plumbing
  4. May 28, 2026Drains and site services
  5. May 29, 2026Mechanical
  6. June 1, 2026Demolition
  7. June 2026Estimated construction start (estimate)
  8. December 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 1615 Dufferin StAddition or alteration · $10M to $25M · August 2026
  • 25 Dynevor RdSmall Residential Projects: conversion to residential · $1M to $5M · August 2026
  • 129 Northcliffe BlvdNew building · $1M to $5M · August 2026
  • 57 Auburn AveNew construction · $1M to $5M · July 2026
  • 46 Ennerdale RdNew construction: demolition · $1M to $5M · February 2026

5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2026 – Dec 2026Estimate
Construction Site SecurityJun 2026 – Jul 2026Window passed (est.)
Concrete and FoundationJun 2026 – Jul 2026Window passed (est.)
Structural SteelJun 2026 – Jul 2026Window passed (est.)
ElevatorsJun 2026 – Aug 2026Window passed (est.)
FramingJun 2026 – Aug 2026Window passed (est.)
PaintingJul 2026 – Aug 2026Window passed (est.)
MasonryJun 2026 – Jul 2026Window passed (est.)
WaterproofingJun 2026 – Jul 2026Window passed (est.)
RoofingJul 2026 – Aug 2026Window passed (est.)
Windows, Doors and GlazingJul 2026 – Aug 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 195 Nairn Ave?

3-Storey House. New house, 3 storeys.

When was the permit issued for 195 Nairn Ave?

May 28, 2026, by the City of Toronto.

Who is building 195 Nairn Ave?

Thomac Holdings Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 195 Nairn Ave need now?

Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.