1954 W 115th St, Chicago: Transit Facility

Transit Facility at 1954 W 115th St, Chicago was permitted on April 22, 2025 with a stated construction value of $1M to $5M. Spr 2019 cbrc - b3-1/rs-3. replacement of existing train station with two warming shelters on the east and west sides of the track along the existing platforms. existing metra parking between w115th st. and w edmaire st. will be repaved. existing metra… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1954 W 115th St, Chicago |
| Project | Transit Facility |
| Building type | Commercial |
| Work | New building |
| Permit issued | April 22, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Spr 2019 cbrc - b3-1/rs-3. replacement of existing train station with two warming shelters on the east and west sides of the track along the existing platforms. existing metra parking between w115th st. and w edmaire st. will be repaved. existing metra…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 14 W Superior St: Residential Project
- 2401 S Wabash Ave: Institutional Project Renovation
- 3825 S Washtenaw Ave: School Renovation
- 6200 W Higgins Ave: Retail Building Renovation
- 200 N La Salle St: Office and Tenant Fit-Out
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1954 W 115th St?
Transit Facility. Spr 2019 cbrc - b3-1/rs-3. replacement of existing train station with two warming shelters on the east and west sides of the track along the existing platforms. existing metra parking between w115th st. and w edmaire st. will be repaved. existing metra…
When was the permit issued for 1954 W 115th St?
April 22, 2025, by the City of Chicago.
Who is building 1954 W 115th St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1954 W 115th St need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.