3825 S Washtenaw Ave, Chicago: School Renovation

School Renovation at 3825 S Washtenaw Ave, Chicago was permitted on June 3, 2025 with a stated construction value of $1M to $5M. Sc 2019 cbc: roof replacement at all existing roofs and mechanical upgrades to the building at an existing cps elementary school. add mechanical ventilation and exhaust to the main building. add keyless entry to main entry. no change in occupancy or exiting.… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3825 S Washtenaw Ave, Chicago |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | June 3, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Sc 2019 cbc: roof replacement at all existing roofs and mechanical upgrades to the building at an existing cps elementary school. add mechanical ventilation and exhaust to the main building. add keyless entry to main entry. no change in occupancy or exiting.…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 14 W Superior St: Residential Project
- 1954 W 115th St: Transit Facility
- 2401 S Wabash Ave: Institutional Project Renovation
- 6200 W Higgins Ave: Retail Building Renovation
- 200 N La Salle St: Office and Tenant Fit-Out
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3825 S Washtenaw Ave?
School Renovation. Sc 2019 cbc: roof replacement at all existing roofs and mechanical upgrades to the building at an existing cps elementary school. add mechanical ventilation and exhaust to the main building. add keyless entry to main entry. no change in occupancy or exiting.…
When was the permit issued for 3825 S Washtenaw Ave?
June 3, 2025, by the City of Chicago.
Who is building 3825 S Washtenaw Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 3825 S Washtenaw Ave need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
