19811 W Rinaldi St, Los Angeles: Apartment Building Renovation

Apartment Building Renovation at 19811 W Rinaldi St, Los Angeles was permitted on August 12, 2026 with a stated construction value of under $1M. NON-STRUCTURAL TENANT IMPROVEMENT TO (E) RETAIL SPACE: DEMO & ADD NON-BEARING PARTITIONS; ADD (N) ROOFTOP MECHANICAL UNITS **ePlan**. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 19811 W Rinaldi St, Los Angeles |
| Project | Apartment Building Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | August 12, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Gray West Construction Inc |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “NON-STRUCTURAL TENANT IMPROVEMENT TO (E) RETAIL SPACE: DEMO & ADD NON-BEARING PARTITIONS; ADD (N) ROOFTOP MECHANICAL UNITS **ePlan**”
Get new $1M+ projects in Los Angeles every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- July 8, 2026Alteration · under $1M
- August 12, 2026Alteration: Apartment Building Renovation · under $1M (this page)
- October 5, 2026Alteration · under $1M
- September 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Gray West Construction Inc has 9 other projects in Builtie
- Los Angeles · Interior alteration · $1M to $5M · 2025
- Los Angeles · Alteration: structural work · under $1M · 2026
- Los Angeles · Alteration: structural work · under $1M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 10 to approach now.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2026 – Mar 2027 | Estimate |
| Construction Site Security | Aug 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Sep 2026 – Oct 2026 | Approach now |
| Waterproofing | Sep 2026 – Oct 2026 | Approach now |
| Roofing | Sep 2026 – Nov 2026 | Approach now |
| Windows, Doors and Glazing | Sep 2026 – Oct 2026 | Approach now |
| Electrical | Oct 2026 – Nov 2026 | Approach now |
| HVAC and Mechanical | Oct 2026 – Nov 2026 | Approach now |
| Plumbing | Sep 2026 – Nov 2026 | Approach now |
| Fire Protection | Oct 2026 – Nov 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 5757 W Wilshire Blvd: Office and Tenant Fit-Out
- 14701 W Ventura Blvd: Office and Tenant Fit-Out
- 5411 N Etiwanda Ave: Office and Tenant Fit-Out
- 948 W 1st St: Office and Tenant Fit-Out
- 4616 W St Elmo Dr: 3-Storey Apartment Building
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 19811 W Rinaldi St?
Apartment Building Renovation. NON-STRUCTURAL TENANT IMPROVEMENT TO (E) RETAIL SPACE: DEMO & ADD NON-BEARING PARTITIONS; ADD (N) ROOFTOP MECHANICAL UNITS **ePlan**
When was the permit issued for 19811 W Rinaldi St?
August 12, 2026, by the City of Los Angeles.
Who is building 19811 W Rinaldi St?
Gray West Construction Inc is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 19811 W Rinaldi St need now?
Estimated as of October 2026, the trades to approach now are site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
