20 Tune Airport Dr, Nashville: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 20, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 20 Tune Airport Dr, Nashville was permitted on July 15, 2025 with a stated construction value of $1M to $5M. To construct new private aircraft hangar with an adjoining office space for JET ACCESS. To include parking, dumpster enclosure, fuel farm enclosure and hangar apron on air side. Poc: Carla Fischer 812-577-7889 bb poc jesse webb. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address20 Tune Airport Dr, Nashville
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkNew building
Permit issuedJuly 15, 2025
Stated construction value$1M to $5M
Estimated stageSub-trades
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “To construct new private aircraft hangar with an adjoining office space for JET ACCESS. To include parking, dumpster enclosure, fuel farm enclosure and hangar apron on air side. Poc: Carla Fischer 812-577-7889 bb poc jesse webb”

Which trades are being bought now

The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Fire Protection25% to 50%
Signage and Wayfinding25% to 70%
Insulation30% to 55%
Drywall35% to 60%
Low Voltage and Data35% to 60%
Tile45% to 65%
Cabinetry and Millwork50% to 70%
Flooring50% to 70%
Countertops55% to 75%
Finish Carpentry55% to 75%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Nashville

All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 20 Tune Airport Dr?

Office and Tenant Fit-Out. To construct new private aircraft hangar with an adjoining office space for JET ACCESS. To include parking, dumpster enclosure, fuel farm enclosure and hangar apron on air side. Poc: Carla Fischer 812-577-7889 bb poc jesse webb

When was the permit issued for 20 Tune Airport Dr?

July 15, 2025, by Metro Nashville and Davidson County.

Who is building 20 Tune Airport Dr?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 20 Tune Airport Dr need now?

At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.