6135 Nolensville Pike, Nashville: Institutional Project

Institutional Project at 6135 Nolensville Pike, Nashville was permitted on October 3, 2025 with a stated construction value of $1M to $5M. NEW CHILD DAYCARE FACILITY FOR LEARNING ZONE LENOX VILLAGE . CONSTRUCTION TYPE IS VB AND THE BUILDING IS SPRINKLERED POC APRIL MILLER see letter from DHS. 33 parking spaces required for this use. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 6135 Nolensville Pike, Nashville |
| Project | Institutional Project |
| Building type | Institutional |
| Work | New building |
| Permit issued | October 3, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “NEW CHILD DAYCARE FACILITY FOR LEARNING ZONE LENOX VILLAGE . CONSTRUCTION TYPE IS VB AND THE BUILDING IS SPRINKLERED POC APRIL MILLER see letter from DHS. 33 parking spaces required for this use”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 20 Tune Airport Dr: Office and Tenant Fit-Out
- 2700 Childrens Way: School Renovation
- 115 Woodmont Blvd: Office and Tenant Fit-Out
- 2100 West End Ave: Hotel Renovation
- 4410 Scenic Dr: Place of Worship Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 6135 Nolensville Pike?
Institutional Project. NEW CHILD DAYCARE FACILITY FOR LEARNING ZONE LENOX VILLAGE . CONSTRUCTION TYPE IS VB AND THE BUILDING IS SPRINKLERED POC APRIL MILLER see letter from DHS. 33 parking spaces required for this use
When was the permit issued for 6135 Nolensville Pike?
October 3, 2025, by Metro Nashville and Davidson County.
Who is building 6135 Nolensville Pike?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 6135 Nolensville Pike need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
