203 W Martin Luther King, Los Angeles: Industrial Building Renovation

Industrial Building Renovation at 203 W Martin Luther King, Los Angeles was permitted on November 18, 2025 with a stated construction value of under $1M. CHANGE OF USE FROM MANUFACTURING TO (N) AUTO REPAIR IN CONJUNCTION W/ (N) AUTOMOBILE DEALERSHIP FRANCHISE; ADD (N) TRASH ENCLOSURE; RE-STRIPE PKG LOT **ePlan**. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 203 W Martin Luther King, Los Angeles |
| Project | Industrial Building Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | November 18, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Finishing |
| Company named on the permit | Lsi-Precision Inc |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “CHANGE OF USE FROM MANUFACTURING TO (N) AUTO REPAIR IN CONJUNCTION W/ (N) AUTOMOBILE DEALERSHIP FRANCHISE; ADD (N) TRASH ENCLOSURE; RE-STRIPE PKG LOT **ePlan**”
Get new $1M+ projects in Los Angeles every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- November 18, 2025Alteration: Industrial Building Renovation · under $1M (this page)
- August 17, 2026Alteration · under $1M
- December 2025Estimated construction start (estimate)
- June 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 4322 S Figueroa StInterior alteration · $1M to $5M · May 2026
1 project of $1M+ was permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Dec 2025 – Jun 2026 | Estimate |
| Signage and Wayfinding | Mar 2026 – Apr 2026 | Window passed (est.) |
| Countertops | Feb 2026 – Mar 2026 | Window passed (est.) |
| Finish Carpentry | Feb 2026 – Mar 2026 | Window passed (est.) |
| Appliances and Equipment | Feb 2026 – Apr 2026 | Window passed (est.) |
| Landscaping | Mar 2026 – May 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (December 2025) to the estimated completion (June 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 12775 W Millennium: Office and Tenant Fit-Out
- 20800 W Sherman Way: Office and Tenant Fit-Out
- 3903 W Sunset Blvd: Office and Tenant Fit-Out
- 758 N Highland Ave: Office and Tenant Fit-Out
- 4501 W Colorado Blvd: Apartment Building Renovation
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 203 W Martin Luther King?
Industrial Building Renovation. CHANGE OF USE FROM MANUFACTURING TO (N) AUTO REPAIR IN CONJUNCTION W/ (N) AUTOMOBILE DEALERSHIP FRANCHISE; ADD (N) TRASH ENCLOSURE; RE-STRIPE PKG LOT **ePlan**
When was the permit issued for 203 W Martin Luther King?
November 18, 2025, by the City of Los Angeles.
Who is building 203 W Martin Luther King?
Lsi-Precision Inc is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 203 W Martin Luther King need now?
Estimated from the permit date, the award windows for signage; countertop; finish carpentry; appliance and equipment; landscaping had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
