21 St Clair Ave E, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 21 St Clair Ave E, Toronto was permitted on June 24, 2026 with a stated construction value of under $1M. Proposal for interior alterations to existing office suites 400 and 403 to combine into one larger office suite. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 21 St Clair Ave E, Toronto |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | June 24, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for interior alterations to existing office suites 400 and 403 to combine into one larger office suite”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since June 201211 other permits at this address
- November 19, 2020Addition or alteration: interior alteration · under $1M
- February 15, 2022Addition or alteration: interior alteration · under $1M
- August 23, 2023Addition or alteration · under $1M
- November 27, 2025Addition or alteration: interior alteration · under $1M
- March 9, 2026Addition or alteration · under $1M
- June 24, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- July 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 3 more renovations within 1 km
- 155 Balmoral AveNew building · $50M to $100M · June 2026
- 29 Pleasant BlvdAddition or alteration: excavation and shoring · $10M to $25M · September 2026
- 5 Scrivener SqAddition or alteration · $1M to $5M · August 2026
- 1262 Yonge StAddition or alteration · $1M to $5M · May 2026
- 44 Jackes AveAddition or alteration · $1M to $5M · May 2026
11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jan 2027 | Estimate |
| Construction Site Security | Jun 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 – Jul 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Painting | Jul 2026 – Sep 2026 | Window passed (est.) |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Jul 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jul 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1876 A Keele St: Residential Project
- 1876 B Keele St: Residential Project
- 120 Town Haven Pl: Apartment Building Renovation
- 277 Victoria St: Residential Project Renovation
- 2902 Dundas St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 21 St Clair Ave E?
Office and Tenant Fit-Out. Proposal for interior alterations to existing office suites 400 and 403 to combine into one larger office suite
When was the permit issued for 21 St Clair Ave E?
June 24, 2026, by the City of Toronto.
Who is building 21 St Clair Ave E?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 21 St Clair Ave E need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.