2149 Cornerstone Bv NE, Calgary: Transit Facility

Transit Facility at 2149 Cornerstone Bv NE, Calgary was permitted on June 5, 2025 with a stated construction value of $1M to $5M. New Sanitary Lift Station Building (Cornerstone). Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2149 Cornerstone Bv NE, Calgary |
| Project | Transit Facility |
| Building type | Industrial |
| Work | New building |
| Permit issued | June 5, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “New Sanitary Lift Station Building (Cornerstone)”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 1609 Centre Av NE: Industrial Building
- 1820 Richmond Rd SW: Institutional Project Renovation
- 7007 54 St SE: Data Centre Renovation
- 98 Alpine Av SW: Retail Building
- 13012 85 St NW: Industrial Building
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2149 Cornerstone Bv NE?
Transit Facility. New Sanitary Lift Station Building (Cornerstone)
When was the permit issued for 2149 Cornerstone Bv NE?
June 5, 2025, by the City of Calgary.
Who is building 2149 Cornerstone Bv NE?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2149 Cornerstone Bv NE need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.