222 Appleton Pl, Nashville: School Renovation

Commercial building under construction with a tower crane
Figures read October 20, 2026 from Builtie's permit data.

School Renovation at 222 Appleton Pl, Nashville was permitted on May 18, 2026 with a stated construction value of $1M to $5M. To conduct interior renovations for existing tenant. VANDERBILT UNIVERSITY - PEABODY CAMPUS, MAINTENANCE BUILDING. Interior renovation of office and locker room spaces. No change in use. No change to exterior building/roof lines or footprint. Poc: John… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address222 Appleton Pl, Nashville
ProjectSchool Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedMay 18, 2026
Stated construction value$1M to $5M
Estimated stageFoundation
Company named on the permitOrion Building Corp
Decision makers and contactsIn Builtie

From the permit: “To conduct interior renovations for existing tenant. VANDERBILT UNIVERSITY - PEABODY CAMPUS, MAINTENANCE BUILDING. Interior renovation of office and locker room spaces. No change in use. No change to exterior building/roof lines or footprint. Poc: John…”

Which trades are being bought now

The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Nashville

All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 222 Appleton Pl?

School Renovation. To conduct interior renovations for existing tenant. VANDERBILT UNIVERSITY - PEABODY CAMPUS, MAINTENANCE BUILDING. Interior renovation of office and locker room spaces. No change in use. No change to exterior building/roof lines or footprint. Poc: John…

When was the permit issued for 222 Appleton Pl?

May 18, 2026, by Metro Nashville and Davidson County.

Who is building 222 Appleton Pl?

Orion Building Corp is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 222 Appleton Pl need now?

At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.