23 Comay Rd, Toronto: School Renovation

School Renovation at 23 Comay Rd, Toronto was permitted on May 6, 2025 with a stated construction value of under $1M. Proposal to alter existing canopies and construct new canopies. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 23 Comay Rd, Toronto |
| Neighbourhood | Brookhaven-Amesbury |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | May 6, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Toronto Catholic District School Board |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to alter existing canopies and construct new canopies”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 27, 2004Plumbing
- May 6, 2025Addition or alteration: School Renovation · under $1M (this page)
- June 2025Estimated construction start (estimate)
- December 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 55 Lonborough AveNew construction: demolition · $1M to $5M · March 2026
2 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Toronto Catholic District School Board has 15 other projects in Builtie
- Toronto · Drains and site services: demolition · $10M to $25M · 2025
- Toronto · Plumbing: addition · $5M to $10M · 2001
- Toronto · Addition or alteration · $1M to $5M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2025 – Dec 2025 | Estimate |
| Fire Protection | Jul 2025 – Aug 2025 | Window passed (est.) |
| Signage and Wayfinding | Aug 2025 – Oct 2025 | Window passed (est.) |
| Insulation | Jul 2025 – Aug 2025 | Window passed (est.) |
| Drywall | Jul 2025 – Aug 2025 | Window passed (est.) |
| Low Voltage and Data | Jul 2025 – Aug 2025 | Window passed (est.) |
| Tile | Jul 2025 – Sep 2025 | Window passed (est.) |
| Cabinetry and Millwork | Jul 2025 – Aug 2025 | Window passed (est.) |
| Flooring | Jul 2025 – Sep 2025 | Window passed (est.) |
| Countertops | Jul 2025 – Sep 2025 | Window passed (est.) |
| Finish Carpentry | Jul 2025 – Sep 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2025) to the estimated completion (December 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 25 Martha Eaton Way: Apartment Building Renovation
- 2301 Keele St: Office and Tenant Fit-Out
- 67 Ingram Dr: Hotel Renovation
- 25 Sheffield St: Industrial Building Renovation
- 1289 Lawrence Ave W: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 23 Comay Rd?
School Renovation. Proposal to alter existing canopies and construct new canopies
When was the permit issued for 23 Comay Rd?
May 6, 2025, by the City of Toronto.
Who is building 23 Comay Rd?
Toronto Catholic District School Board is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 23 Comay Rd need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.