67 Ingram Dr, Toronto: Hotel Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Hotel Renovation at 67 Ingram Dr, Toronto was permitted on January 22, 2026 with a stated construction value of under $1M. Proposal to convert 390 m² of office space to hotel use. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address67 Ingram Dr, Toronto
NeighbourhoodBrookhaven-Amesbury
ProjectHotel Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedJanuary 22, 2026
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal to convert 390 m² of office space to hotel use”

Where this project is

  1. January 22, 2026Addition or alteration: Hotel Renovation · under $1M (this page)
  2. February 13, 2026Plumbing
  3. February 20, 2026Mechanical
  4. February 2026Estimated construction start (estimate)
  5. August 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–3, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Feb 2026 – Aug 2026Estimate
Fire ProtectionMar 2026 – Apr 2026Window passed (est.)
Signage and WayfindingApr 2026 – Jun 2026Window passed (est.)
InsulationMar 2026 – Apr 2026Window passed (est.)
DrywallMar 2026 – May 2026Window passed (est.)
Low Voltage and DataMar 2026 – May 2026Window passed (est.)
TileApr 2026 – May 2026Window passed (est.)
Cabinetry and MillworkMar 2026 – May 2026Window passed (est.)
FlooringApr 2026 – May 2026Window passed (est.)
CountertopsApr 2026 – May 2026Window passed (est.)
Finish CarpentryApr 2026 – May 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (February 2026) to the estimated completion (August 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 67 Ingram Dr?

Hotel Renovation. Proposal to convert 390 m² of office space to hotel use

When was the permit issued for 67 Ingram Dr?

January 22, 2026, by the City of Toronto.

Who is building 67 Ingram Dr?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 67 Ingram Dr need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.