2300 Clifton Ave, Nashville: Warehouse Renovation

Warehouse Renovation at 2300 Clifton Ave, Nashville was permitted on July 10, 2026 with a stated construction value of $1M to $5M. To conduct interior renovations for existing tenant; LOENBRO ELECTRICAL (building contractor supply). To include build-out portion of existing warehouse space to be used as office space. No change in use. No change to exterior building/roof lines or footprint. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2300 Clifton Ave, Nashville |
| Project | Warehouse Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | July 10, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To conduct interior renovations for existing tenant; LOENBRO ELECTRICAL (building contractor supply). To include build-out portion of existing warehouse space to be used as office space. No change in use. No change to exterior building/roof lines or footprint”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 415 11th Ave N: Restaurant Renovation
- 603 C Vernon Ave: Office and Tenant Fit-Out
- 3909 A Hillsboro Pike: Apartment Building Renovation
- 752 Hamilton Ave: Office and Tenant Fit-Out
- 3810 Clifton Ave: Retail Building
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2300 Clifton Ave?
Warehouse Renovation. To conduct interior renovations for existing tenant; LOENBRO ELECTRICAL (building contractor supply). To include build-out portion of existing warehouse space to be used as office space. No change in use. No change to exterior building/roof lines or footprint
When was the permit issued for 2300 Clifton Ave?
July 10, 2026, by Metro Nashville and Davidson County.
Who is building 2300 Clifton Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2300 Clifton Ave need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
