2300 Patterson St, Nashville: 7-Storey Healthcare Building Renovation

7-Storey Healthcare Building Renovation at 2300 Patterson St, Nashville was permitted on August 7, 2026 with a stated construction value of $10M to $25M. To construct ELEVATOR ADDITION and RENOVATIONS for existing tenant; TriStar Centennial Medical Center (Hospital). WORK INCLUDES NEW ELEVATOR SHAFT CONSTRUCTION, STRUCTURAL MODIFICATIONS, AND MULTI-FLOOR ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2300 Patterson St, Nashville |
| Project | 7-Storey Healthcare Building Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | August 7, 2026 |
| Stated construction value | $10M to $25M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To construct ELEVATOR ADDITION and RENOVATIONS for existing tenant; TriStar Centennial Medical Center (Hospital). WORK INCLUDES NEW ELEVATOR SHAFT CONSTRUCTION, STRUCTURAL MODIFICATIONS, AND MULTI-FLOOR ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND…”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1300 4th Ave S: 3-Storey Apartment Building
- 2410 Patterson St: Healthcare Building Renovation
- 1215 21st Ave S: Office and Tenant Fit-Out
- 1819 E Belmont Cir: Institutional Project Renovation
- 3319 West End Ave: Office and Tenant Fit-Out
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2300 Patterson St?
7-Storey Healthcare Building Renovation. To construct ELEVATOR ADDITION and RENOVATIONS for existing tenant; TriStar Centennial Medical Center (Hospital). WORK INCLUDES NEW ELEVATOR SHAFT CONSTRUCTION, STRUCTURAL MODIFICATIONS, AND MULTI-FLOOR ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND…
When was the permit issued for 2300 Patterson St?
August 7, 2026, by Metro Nashville and Davidson County.
Who is building 2300 Patterson St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2300 Patterson St need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.