2302 S 1st Pl, Broken Arrow: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 2302 S 1st Pl, Broken Arrow was permitted on August 8, 2025. Coba- Op Center Admin - THE PROJECT IS A INTERIOR REMODEL, ALTERATION LEVEL 3, OF AN EXISTING 16,237 SF OFFICE BUILDING. THE BUILDING IS NOT EQUIPPED WITH AN AUTOMATIC SPRINKLER SYSTEM. THE OCCUPANCY AND TYPE OF THE BUILDING IS NOT CHANGING. CITY PROJECT. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2302 S 1st Pl, Broken Arrow |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | August 8, 2025 |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Coba- Op Center Admin - THE PROJECT IS A INTERIOR REMODEL, ALTERATION LEVEL 3, OF AN EXISTING 16,237 SF OFFICE BUILDING. THE BUILDING IS NOT EQUIPPED WITH AN AUTOMATIC SPRINKLER SYSTEM. THE OCCUPANCY AND TYPE OF THE BUILDING IS NOT CHANGING. CITY PROJECT”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Broken Arrow
- 1439 E College St: Apartment Building
- 1443 E College St: Apartment Building
- 209 S Main St: Commercial Project Renovation
- 2144 E Albany St: Retail Building
- 850 N 45th Pl: Commercial Project
All of them: construction projects in Broken Arrow by address. The data is Broken Arrow's own building permits. Neighbouring cities issue their own permits and are not in this count. It is a smaller feed than Tulsa's, so the counts move more from month to month.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2302 S 1st Pl?
Office and Tenant Fit-Out. Coba- Op Center Admin - THE PROJECT IS A INTERIOR REMODEL, ALTERATION LEVEL 3, OF AN EXISTING 16,237 SF OFFICE BUILDING. THE BUILDING IS NOT EQUIPPED WITH AN AUTOMATIC SPRINKLER SYSTEM. THE OCCUPANCY AND TYPE OF THE BUILDING IS NOT CHANGING. CITY PROJECT
When was the permit issued for 2302 S 1st Pl?
August 8, 2025, by the City of Broken Arrow.
Who is building 2302 S 1st Pl?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2302 S 1st Pl need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
