243-255 Consumers Rd, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 243-255 Consumers Rd, Toronto was permitted on July 25, 2025 with a stated construction value of under $1M. Upgrade to the buildings fire alarm panel, replacing head-end equipment and initiating devices. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 243-255 Consumers Rd, Toronto |
| Neighbourhood | Henry Farm |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | July 25, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Sdm Construction Inc. |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Upgrade to the buildings fire alarm panel, replacing head-end equipment and initiating devices”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since April 200016 other permits at this address
- April 19, 2000Non-Residential Building Permit: interior alteration · under $1M
- April 30, 2018New building · $25M to $50M
- May 1, 2018Addition or alteration: interior alteration · under $1M
- October 13, 2023Addition or alteration · under $1M
- July 25, 2025Fire and life safety: Office and Tenant Fit-Out · under $1M (this page)
- November 20, 2025Addition or alteration: interior alteration · under $1M
- August 2025Estimated construction start (estimate)
- February 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 245 Consumers RdAddition or alteration: interior alteration · $5M to $10M · July 2026
- 2235 Sheppard Ave EAddition or alteration: interior alteration · $5M to $10M · September 2026
- 20 Evermede DrAddition or alteration: roofing · $1M to $5M · February 2026
3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2025 – Feb 2026 | Estimate |
| Fire Protection | Sep 2025 – Oct 2025 | Window passed (est.) |
| Signage and Wayfinding | Nov 2025 – Dec 2025 | Window passed (est.) |
| Insulation | Sep 2025 – Nov 2025 | Window passed (est.) |
| Drywall | Oct 2025 – Nov 2025 | Window passed (est.) |
| Low Voltage and Data | Oct 2025 – Nov 2025 | Window passed (est.) |
| Tile | Oct 2025 – Nov 2025 | Window passed (est.) |
| Cabinetry and Millwork | Oct 2025 – Nov 2025 | Window passed (est.) |
| Flooring | Oct 2025 – Nov 2025 | Window passed (est.) |
| Countertops | Oct 2025 – Nov 2025 | Window passed (est.) |
| Finish Carpentry | Oct 2025 – Nov 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (August 2025) to the estimated completion (February 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 280 Consumers Rd: Office and Tenant Fit-Out
- 65 Forest Manor Rd: Apartment Building Renovation
- 2550 Victoria Park Ave: Residential Project Renovation
- 218 Yonge St: Office and Tenant Fit-Out
- 4917-4975 Yonge St: Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 243-255 Consumers Rd?
Office and Tenant Fit-Out. Upgrade to the buildings fire alarm panel, replacing head-end equipment and initiating devices
When was the permit issued for 243-255 Consumers Rd?
July 25, 2025, by the City of Toronto.
Who is building 243-255 Consumers Rd?
Sdm Construction Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 243-255 Consumers Rd need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.