29 Hatherley Rd, Toronto: Accessory Dwelling Unit Renovation

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Accessory Dwelling Unit Renovation at 29 Hatherley Rd, Toronto was permitted on September 24, 2026 with a stated construction value of under $1M. Renovation or addition to an accessory dwelling unit. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address29 Hatherley Rd, Toronto
ProjectAccessory Dwelling Unit Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedSeptember 24, 2026
Housing units1
Stated construction valueunder $1M
Estimated stagePermit
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. November 12, 2024New construction: demolition · $1M to $5M
  2. April 7, 2025Plumbing: demolition
  3. April 7, 2025Mechanical: demolition
  4. September 24, 2026Small Residential Projects: Accessory Dwelling Unit Renovation · under $1M (this page)
  5. October 2026Estimated construction start (estimate)
  6. April 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

6 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 to approach now.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2026 – Apr 2027Estimate
Excavation and Site WorkSep 2026 – Oct 2026Approach now
Construction Site SecuritySep 2026 – Nov 2026Approach now
Concrete and FoundationSep 2026 – Oct 2026Approach now
Structural SteelOct 2026 – Nov 2026Approach now
ElevatorsOct 2026 – Nov 2026Approach now
FramingOct 2026 – Nov 2026Approach now
PaintingOct 2026 – Dec 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (October 2026) to the estimated completion (April 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 29 Hatherley Rd?

Accessory Dwelling Unit Renovation. Renovation or addition to an accessory dwelling unit.

When was the permit issued for 29 Hatherley Rd?

September 24, 2026, by the City of Toronto.

Who is building 29 Hatherley Rd?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 29 Hatherley Rd need now?

Estimated as of October 2026, the trades to approach now are excavation and site work; site security; concrete; structural steel; elevator; framing; painting.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.