2902 Brick Church Pike, Nashville: Data Centre

Data Centre at 2902 Brick Church Pike, Nashville was permitted on September 19, 2025 with a stated construction value of $10M to $25M. To construct a single-story 103,877 SF structure to accommodate a Data Center (established as professional office use). To fit out Administrative Offices and 1 Data Hall (out of 2 leaving one Data Hall in white box condition, future tenant improvement permit… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2902 Brick Church Pike, Nashville |
| Project | Data Centre |
| Building type | Commercial |
| Work | New building |
| Permit issued | September 19, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Framing |
| Company named on the permit | Dpr Construction, A General Partnership |
| Decision makers and contacts | In Builtie |
From the permit: “To construct a single-story 103,877 SF structure to accommodate a Data Center (established as professional office use). To fit out Administrative Offices and 1 Data Hall (out of 2 leaving one Data Hall in white box condition, future tenant improvement permit…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1405 25th Ave S: School
- 1200 18th Ave S: 2-Storey School
- 760 B Old Hickory Blvd: 5-Storey Hotel
- 312 Rosa L Parks Ave: Office and Tenant Fit-Out
- 2200 Childrens Way: Healthcare Building Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2902 Brick Church Pike?
Data Centre. To construct a single-story 103,877 SF structure to accommodate a Data Center (established as professional office use). To fit out Administrative Offices and 1 Data Hall (out of 2 leaving one Data Hall in white box condition, future tenant improvement permit…
When was the permit issued for 2902 Brick Church Pike?
September 19, 2025, by Metro Nashville and Davidson County.
Who is building 2902 Brick Church Pike?
Dpr Construction, A General Partnership is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 2902 Brick Church Pike need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.