760 B Old Hickory Blvd, Nashville: 5-Storey Hotel

5-Storey Hotel at 760 B Old Hickory Blvd, Nashville was permitted on April 10, 2025 with a stated construction value of $10M to $25M. To construct 5 story, 389 space precast concrete parking structure for existing hotel. Commercial PUD Overlay Poc: Anthony Murphy 704.926.3367. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 760 B Old Hickory Blvd, Nashville |
| Project | 5-Storey Hotel |
| Building type | Commercial |
| Work | New building |
| Permit issued | April 10, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To construct 5 story, 389 space precast concrete parking structure for existing hotel. Commercial PUD Overlay Poc: Anthony Murphy 704.926.3367”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1405 25th Ave S: School
- 2902 Brick Church Pike: Data Centre
- 2000 Church St: Healthcare Building Renovation
- 1200 18th Ave S: 2-Storey School
- 3205 Whites Creek Pike: Warehouse Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 760 B Old Hickory Blvd?
5-Storey Hotel. To construct 5 story, 389 space precast concrete parking structure for existing hotel. Commercial PUD Overlay Poc: Anthony Murphy 704.926.3367
When was the permit issued for 760 B Old Hickory Blvd?
April 10, 2025, by Metro Nashville and Davidson County.
Who is building 760 B Old Hickory Blvd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 760 B Old Hickory Blvd need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
