2000 Church St, Nashville: Healthcare Building Renovation

Healthcare Building Renovation at 2000 Church St, Nashville was permitted on March 28, 2025 with a stated construction value of $10M to $25M. The project primarily consists of renovation to an existing unused surgery suite and renovation to existing patient rooms on the 4th floor Midtown Hospital. This first package was issued and approved as a demo package back in September for reference… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2000 Church St, Nashville |
| Project | Healthcare Building Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | March 28, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “The project primarily consists of renovation to an existing unused surgery suite and renovation to existing patient rooms on the 4th floor Midtown Hospital. This first package was issued and approved as a demo package back in September for reference…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 3205 Whites Creek Pike: Warehouse Renovation
- 1311 21st Ave S: Healthcare Building Renovation
- 711 Justice Way: Campus Building
- 760 B Old Hickory Blvd: 5-Storey Hotel
- 800 Monroe St: Retail Building Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2000 Church St?
Healthcare Building Renovation. The project primarily consists of renovation to an existing unused surgery suite and renovation to existing patient rooms on the 4th floor Midtown Hospital. This first package was issued and approved as a demo package back in September for reference…
When was the permit issued for 2000 Church St?
March 28, 2025, by Metro Nashville and Davidson County.
Who is building 2000 Church St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2000 Church St need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.