310 Florentia St, Seattle: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 310 Florentia St, Seattle was permitted on May 21, 2025 with a stated construction value of $1M to $5M. Construct tenant improvements for classrooms (Goddard Child Care Facility) at ground floor of existing commercial building (Fremont Crossing) occupy per plan. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 310 Florentia St, Seattle |
| Project | Office and Tenant Fit-Out |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | May 21, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Construct tenant improvements for classrooms (Goddard Child Care Facility) at ground floor of existing commercial building (Fremont Crossing) occupy per plan”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Seattle
- 1100 23rd Ave: Mixed-Use Building Renovation
- 1119 1st Ave: Apartment Building Renovation
- 1250 1st Ave S: Office and Tenant Fit-Out
- 1313 E Columbia St: Campus Building Renovation
- 1652 SW Lander St: Industrial Building Renovation
All of them: construction projects in Seattle by address. Seattle's feed rarely names the builder: 1.4% of new-build permits carry one. Builtie resolves the company behind a Seattle project from other records, and does not publish a Seattle builder count because it would describe the feed rather than the market.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 310 Florentia St?
Office and Tenant Fit-Out. Construct tenant improvements for classrooms (Goddard Child Care Facility) at ground floor of existing commercial building (Fremont Crossing) occupy per plan
When was the permit issued for 310 Florentia St?
May 21, 2025, by the City of Seattle.
Who is building 310 Florentia St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 310 Florentia St need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
