3350 S Moore St, Los Angeles: Single-Family House Renovation

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Single-Family House Renovation at 3350 S Moore St, Los Angeles was permitted on February 8, 2026 with a stated construction value of under $1M. Renovation or addition to a single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address3350 S Moore St, Los Angeles
ProjectSingle-Family House Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedFebruary 8, 2026
Stated construction valueunder $1M
Estimated stageFinishing
Company named on the permitZepeda General Building See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. January 21, 2026Grading · under $1M
  2. February 8, 2026Addition: Single-Family House Renovation · under $1M (this page)
  3. February 24, 2026Demolition · under $1M
  4. March 2026Estimated construction start (estimate)
  5. September 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Zepeda General Building has 9 other projects in Builtie

  • Los Angeles · New home · under $1M · 2025
  • Los Angeles · New home · under $1M · 2025
  • Los Angeles · Grading: addition · under $1M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Mar 2026 – Sep 2026Estimate
Signage and WayfindingMay 2026 – Jul 2026Window passed (est.)
CountertopsMay 2026 – Jun 2026Window passed (est.)
Finish CarpentryMay 2026 – Jun 2026Window passed (est.)
Appliances and EquipmentMay 2026 – Jun 2026Window passed (est.)
LandscapingMay 2026 – Jul 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (March 2026) to the estimated completion (September 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Los Angeles

All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 3350 S Moore St?

Single-Family House Renovation. Renovation or addition to a single-family house.

When was the permit issued for 3350 S Moore St?

February 8, 2026, by the City of Los Angeles.

Who is building 3350 S Moore St?

Zepeda General Building is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 3350 S Moore St need now?

Estimated from the permit date, the award windows for signage; countertop; finish carpentry; appliance and equipment; landscaping had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.