350 Victoria St, Toronto: Campus Building Renovation

Campus Building Renovation at 350 Victoria St, Toronto was permitted on August 22, 2025 with a stated construction value of under $1M. Proposed interior alterations - RMS POD 248, 252 - new partitions, plumbing, HVAC, lighting. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 350 Victoria St, Toronto |
| Neighbourhood | Downtown Yonge East |
| Project | Campus Building Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | August 22, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed interior alterations - RMS POD 248, 252 - new partitions, plumbing, HVAC, lighting”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since May 200229 other permits at this address
- May 2, 2002Mechanical · under $1M
- August 23, 2005Addition or alteration: interior alteration · under $1M
- April 26, 2006Addition or alteration: interior alteration · $1M to $5M
- September 25, 2019Addition or alteration: interior alteration · under $1M
- April 30, 2021Mechanical · under $1M
- August 22, 2025Addition or alteration: Campus Building Renovation · under $1M (this page)
- September 2025Estimated construction start (estimate)
- March 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 8 Elm StNew building · over $250M · March 2026
- 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
- 227 Gerrard St ENew building · $25M to $50M · October 2025
- 900 Bay StAddition or alteration: interior alteration · $25M to $50M · April 2026
- 150 College StAddition or alteration: demolition · $25M to $50M · May 2026
45 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2025 – Mar 2026 | Estimate |
| Fire Protection | Oct 2025 – Nov 2025 | Window passed (est.) |
| Signage and Wayfinding | Dec 2025 – Jan 2026 | Window passed (est.) |
| Insulation | Oct 2025 – Dec 2025 | Window passed (est.) |
| Drywall | Nov 2025 – Dec 2025 | Window passed (est.) |
| Low Voltage and Data | Nov 2025 – Dec 2025 | Window passed (est.) |
| Tile | Nov 2025 – Dec 2025 | Window passed (est.) |
| Cabinetry and Millwork | Nov 2025 – Dec 2025 | Window passed (est.) |
| Flooring | Nov 2025 – Dec 2025 | Window passed (est.) |
| Countertops | Nov 2025 – Dec 2025 | Window passed (est.) |
| Finish Carpentry | Nov 2025 – Dec 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (September 2025) to the estimated completion (March 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 30 Adelaide St E: Office and Tenant Fit-Out
- 55 Lombard St: Office and Tenant Fit-Out
- 18 King St E: Apartment Building Renovation
- 45 Carlton St: Apartment Building Renovation
- 89 Yonge St: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 350 Victoria St?
Campus Building Renovation. Proposed interior alterations - RMS POD 248, 252 - new partitions, plumbing, HVAC, lighting
When was the permit issued for 350 Victoria St?
August 22, 2025, by the City of Toronto.
Who is building 350 Victoria St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 350 Victoria St need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.