3622 W Washington Blvd, Los Angeles: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 3622 W Washington Blvd, Los Angeles was permitted on January 13, 2026 with a stated construction value of under $1M. (eplan) CHANGE OF USE FROM EXISTING ARTIST STUDIO TO VETERINARY CLINIC INCLUDING TENANT IMPROVEMENT, INSTALLING METHANE MITIGATION SYSTEM, AND STRUCTURAL ALTERATIONS AND ADDITION OF NEW CANOPY OVER RAMP. EXTERIOR WORK SHALL INCLUDE RE-GRADING OF EXISTING… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address3622 W Washington Blvd, Los Angeles
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedJanuary 13, 2026
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitRight Angle Builders
Decision makers and contactsSee who to contact — free trial

From the permit: “(eplan) CHANGE OF USE FROM EXISTING ARTIST STUDIO TO VETERINARY CLINIC INCLUDING TENANT IMPROVEMENT, INSTALLING METHANE MITIGATION SYSTEM, AND STRUCTURAL ALTERATIONS AND ADDITION OF NEW CANOPY OVER RAMP. EXTERIOR WORK SHALL INCLUDE RE-GRADING OF EXISTING…”

Where this project is

  1. January 13, 2026Addition: Office and Tenant Fit-Out · under $1M (this page)
  2. January 14, 2026Grading · under $1M
  3. February 2026Estimated construction start (estimate)
  4. August 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Feb 2026 – Aug 2026Estimate
Construction Site SecurityJan 2026 – Mar 2026Window passed (est.)
PaintingFeb 2026 – Apr 2026Window passed (est.)
MasonryFeb 2026 – Mar 2026Window passed (est.)
WaterproofingFeb 2026 – Mar 2026Window passed (est.)
RoofingMar 2026 – Apr 2026Window passed (est.)
Windows, Doors and GlazingFeb 2026 – Mar 2026Window passed (est.)
ElectricalMar 2026 – Apr 2026Window passed (est.)
HVAC and MechanicalMar 2026 – Apr 2026Window passed (est.)
PlumbingMar 2026 – Apr 2026Window passed (est.)
Fire ProtectionMar 2026 – Apr 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (February 2026) to the estimated completion (August 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Los Angeles

All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 3622 W Washington Blvd?

Office and Tenant Fit-Out. (eplan) CHANGE OF USE FROM EXISTING ARTIST STUDIO TO VETERINARY CLINIC INCLUDING TENANT IMPROVEMENT, INSTALLING METHANE MITIGATION SYSTEM, AND STRUCTURAL ALTERATIONS AND ADDITION OF NEW CANOPY OVER RAMP. EXTERIOR WORK SHALL INCLUDE RE-GRADING OF EXISTING…

When was the permit issued for 3622 W Washington Blvd?

January 13, 2026, by the City of Los Angeles.

Who is building 3622 W Washington Blvd?

Right Angle Builders is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 3622 W Washington Blvd need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.